The Rockford Fire Department has implemented an Annual Commercial Pre-Plan Program in which each individual fire company performs (30) detailed pre-plans of target hazard buildings in their still response territory. These pre-plans include information on the building's location, occupancy, hazards, fire department connections, hydrants, building layout, and other pertinent data that would assist the fire department in case of an emergency. Each fire company also draws these buildings with the Fire Zone CAD Drawing Software. These drawings are then accessible by a computer during an incident at that location.
The pre-plan database now includes over 6,000 pre-plans and 9,000 technical drawings.